At the end of a long transmission line, storms mean outages. For a hospital, that is not an option.
The hospital serves a remote coastal community where storms cause frequent, prolonged grid outages, and patient care depends on stable power. At the same time, the utility expects regional demand to keep rising, adding pressure to infrastructure that is already stretched.
Working with the provincial utility and the regional health authority, we installed a 400 kWh / 220 kW Luna BESS. During an outage it provides backup power and a seamless transition for the hospital’s non-critical loads. When the grid is up, the system takes part in the utility’s demand-response program, discharging during peak events to relieve the local grid.
Seamless transfer to battery power for non-critical loads the moment the grid drops.
The BESS answers utility calls during peak events, easing strain on the regional grid.
Local storage adds capacity at the end of the line, where it helps most.
Outdoor-rated and remotely monitored, suited to a site far from service crews.
Tell us about your load, your grid connection and your timeline. We will size a system around it.
Request Your Energy Assessment