An international airport was electrifying its fleet faster than its charging infrastructure could keep up.
The airport is moving its fleet vehicles to electric as part of its sustainability plan. Its existing charging infrastructure could not support the shift, and expanding grid service at an active airport is slow and expensive. Without more charging capacity, an all-electric fleet could not run reliably.
We deployed a 400 kWh / 220 kW Luna BESS to demonstrate battery-backed EV charging on an airport site. The system stores energy when demand is low and supplies the chargers during peaks, so the site gets more charging capacity from the same grid connection. It lowers operating costs and gives the airport a proven model for scaling charging across the fleet.
Stored energy supplements the grid connection so more vehicles can charge at once.
The BESS covers demand spikes, keeping the site below costly peak thresholds.
Charging growth no longer waits on a service upgrade at a busy airport.
Real operating data from this deployment informs the fleet-wide rollout.